Recent Projects
-
Liquid Roofing
Location: Abbots Bromley, Staffordshire
The customer had the same repeated problems and wanted a long term fix. The previous repair jobs had failed due to the area having limited access due to a pitched roof in the centre of the extension and a parapet wall.
Click Here
The mineral felt had been scrubbed moss free and all dirt/dust removed, leaving a clean surface. The area had been primed before applying a basecoat layer of Silka.
After 24 hours a further coat was applied on top of a fibre glass matting Finishing with a top coat. -
Extended Garage with Rubber Roof - Burton on Trent - Extension
Location: Burton on Trent
With this project the customer requested for the existing car port to be took down and the garage roof to be extended to the front of the property (further 5 metres).
Click Here
The garage door was brought to the front of the property, making the garage in total 16 metres long in length.
The roof was strengthened and boarded and finished with a rubber membrane (trims accordingly to finish).
Another happy customer!! -
NEW SLATE ROOF- DERBYSHIRE - SLATE ROOF
Location: DERBYSHIRE
Contract Duration: 6 days
A re-roof based in Derbyshire, consisting of two terraces that were stripped of ludlow majors and replaced with 20 x 10's natural Spanish slate specified by the customer.
Click Here
As well as 4 chimney re-leaded and re-pointed.
Another happy customer. -
Flat Roof Replacement - FLAT ROOF
Location: SWADLINCOTE, DERBYSHIRE
This flat roof had perished in numerous places, so to bring the roof up to spec the mineral felt was stripped off, insulated with 100mm celotex boarded over and finished with a rubber membrane. All facias were replaced and trims were applied to the flat roof with a high standard finish.
Click Here
Another happy customer!!! -
Reroofing Slate Roof - SLATE ROOF
Location: BURTON ON TRENT
The customer wanted to reuse the slates on the road facing side of the property in-keeping with the authentic look of the property. The original roof was stripped carefully finishing with around 30% breakages. The loft space was fully insulated before covering the roof with breathable membrane.
Click Here
Replaced all rainwater goods with new deep flow gutter system.
Out house was stripped and re done in new slate which really sets the building off.